Installing a NetIron XMR 16000 router
3
CAUTION
To ensure adequate bonding when attaching the ground lug, a minimum of 20 PSI of torque is
required to be applied to the mounting hardware used to attach the ground lug.
FIGURE 108 Crimping the power supply wire in the lug
5. Connect the -48V cable to the negative terminal and the 0V cable to the positive terminal as
marked on the power supply.
NOTE
DC return must be isolated from the device ground (DC-I) when connecting to the power supply.
6. Replace the transparent cover.
This equipment installation must meet NEC/CEC code requirements. Consult local authorities for
regulations.
Final steps
Follow these steps to complete the installation:
Attaching a management station”
Activating the power source”
“Verifying proper operation”
Installing a NetIron XMR 16000 router
This section describes how to install a NetIron XMR 16000 router.
Preparing the installation site
Before installing the router, plan the location and orientation relative to other devices and
equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front,
and the back of the router and walls or other obstructions. If a router is installed in a perforated
enclosure, the perforations must cover at least 60 percent of the surface.
1 AWG power supply wire:
#8 AWG wire for 1200 W power supply
#6 AWG wire for 1800 W power supply
1
Zobrazit stránku 172
1 2 ... 168 169 170 171 172 173 174 175 176 177 178 ... 341 342

Komentáře k této Příručce

Žádné komentáře